Description
Visible vehicle access through a secure perimeter
The two mesh leaves coordinate with a construction fence while retaining visibility. The listed made-to-order lead time is 15–20 working days.
Plan the site before ordering
Measure the opening and swing, plan drop bolts and hold-open restraint, and verify foundations and fence interfaces.
For made-to-order or installation enquiries, send dimensions, photographs, vehicle details and the site postcode through our project form.







Reviews
There are no reviews yet.